HYDRO ELECTRIC POWER PLANT PROJECTS DEVELOPMENT IN BINTAN, RIAU ISLAND, INDONESIA

Electricity Condition in Bintan, Riau Island, Indonesia

Supply       : 1.560 MW
Peak Load : 1.420 MW
Surplus      : 140 MW

PROGRAMS AND ACTIVITIES OF MINIY AND ENERGY OFFICE OF NORTH SUMATRA PROVINCE

  1. Conducting survey of potential energy that can be developed for electricity generation
  2. Performing feasibility study for Micro Hydro Power Plant (PLTMH) Development
  3. Development of Micro Hydro Power Plant
  4. Coaching and technical assistance to operate and maintain solar / SHS and Micro Hydro Power Plant (PLTMH)
  5. Encourage investment of Power Plant Depelovment
  6. Encourage the establishment of BUMN / BUMD for Asahan river management
  7. Improvement of human resources, research and development of clean energy, efficient, renewable and environmentally friendly
  8. Proposed to the central government that issued location permitt, for hydroelectric construction requires that the real potential of the area can be oftimally developed.

HYDRO ENERGY POTENTIAL IN THE NORTH SUMATRA PROVINCE THAT NOT YET USED / BUILT

NO Regency Potential Capacity (MW)
1 Asahan 182.5
2 Langkat 401
3 Tapanuli Utara 504
4 Mandailing Natal 232.5
5 Humbang Hasudutan 141.5
6 Tapanuli Selatan 250
7 Dairi 31
8 Pakpak Barat 131.5
9 Tapanuli Tengah 50
10 Simalungun 76

Micro Hydro Power ini cocok untuk daerah pedesaan karena memiliki beberapa keunggulan seperti :
  • Sangat ramah lingkungan
  • Murah
  • Mendorong konservasi hutan
  • Mendorong industri kecil di desa
  • Perawatannya relatif lebih murah
  • Mendorong kelembagaan desa