Inspection and diagnostics
Extend the life time of your transformers
The three main factors which can affect the
health of the transformers are the paper, which is used for conductor
insulation, the pressboard which is used for the major insulation and winding
support and the insulating oil.
With age, water and contaminants (air or gas
bubbles, particles of different origin, oxygen, and oil ageing) dissolve in the
dielectric fluid of the transformer increasing the risk of failures or
accelerating ageing of the insulation system, thus reducing the technical life.
The level of possible contamination of the insulating oil over the years
depends on its design, especially on the effectiveness of the oil preservation
system, and sources of contamination.
By sampling and analyzing the dielectric
fluid, the presence of contaminants can be detected and appropriate
preventative actions initiated. The Oil and Gas Analysis remains a critical
component of the condition assessment of the transformer.
Why ABB?
Combining
the latest test technology and equipment with a century of design knowledge and
expertise, ensures reliable test reports and recommendations
By
translating the test data into actionable information and recommendations, an
informed decision can be taken on how to tackle the condition of the
transformer
Service solutions aimed at addressing problems with the transformer,
such as Oil Filtration, Oil Reclamation, Vapour Phase Drying (VPH), are readily
available
Are you looking for support or purchase
information?
Contact us
Get to know more about oil testing solutions
Scope of work
Methods to
assess the quality of the transformer oil:
|
|
Dielectric
breakdown strength
|
This test
measures the voltage at which the oil electrically breaks down and provides
the good indication of the amount of contaminants.
|
Interfacial
tension
|
This test
determines the interfacial tension between the oil sample and distilled
water.
|
Acid
neutralization number
|
This test
helps to determine the acid number or acidity of the oil which can be caused
by the oxidation process of the insulation forming acids and sludge
formation.
|
Power
factor
|
This test
helps to indicate the dielectric loss leakage current of the oil.
|
Furan
analysis
|
This test
helps to understand the paper degradation rate.
|
PCB
content
|
This test
determines the PCB content in the oil and if it meets local environmental
regulations.
|
Corrosive
Sulphur CCD test
|
New test
developed to identify oil that may have caused copper sulphide precipitation
in cellulosic insulation.
|
Dissolved
Gas Analysis DGA
|
This test
helps to analyze the gasses dissolved in the oil and this test has been used
to detect faults or to investigate the cause of the failure.
|
Using our global reach, we support many
customers world-wide in the collection of oil samples, the oil and gas analysis
in our certified oil laboratories, as well as providing a first analysis of the
units health status. Combining this with our extensive design knowledge as well
as repair/refurbishment know-how, accumulated over the years, we can present a
more comprehensive report with appropriate recommendations to prolong the usage
of the transformer.
Online oil regeneration has technical and
economic advantages when applied to old transformers with aged, acidic oil. The
process is more environmentally friendly than oil replacement, and demonstrates
much better efficiency over the long term. This is a very efficient alternative
to passivation, since it enables definitive removal of corrosive compounds from
corrosive oils, thus avoiding the risk of copper sulphide formation.
TRAFO-TECH INSPECTION SERVICES
Assessment & Maintenance Plan
Transformers are low maintenance, but not free of
maintenance. To determine the maintenance need of your transformer(s),
Maintenance Partners offers an assessment that consists of visual inspections,
oil sampling, thermography and electrical measurements.
The assessment is the foundation for a maintenance
plan in which the condition and priority of each transformer are decisive for
the maintenance frequency and needs.
Transformatoren Maintenance Partners - Preventief
Onderhoud - StaalnamePreventive Maintenance
For a safe and reliable operation of transformers,
preventive maintenance is a must. This detects problems at an early stage and
can prevent further deterioration. Preventive maintenance includes the
following tests:
Oil sampling
+ analysis (Oil quality, PCB, furan detection, moist level, …)
Electrical
measurements (Insulation resistance, Winding resistance, Transformer Turn
Ratios, SFRA-Sweep Frequency Response Analysis, IDAX- Tgδ, …)
In addition, accessories and protections are checked
(Detection Gas Pressure Temperature, Buchholz, Thermometer & Fans) and
silica gel is replaced.
Maintenance & Repairs Onsite
Transformatoren Maintenance Partners - Onderhoud
Onsite 460Besides preventive maintenance, we also execute repairs. The
following services are offered onsite:
Dehumidifying, degassing and filtering of oil using steamliner (up to
10.000 l/h)
Refilling or
replacing oil
Replacing or
repairing of accessories
Renewing of
gaskets (all types)
Cleaning of
contacts and adjusting torque
Replacing of
bushings
Repairing
resin / removing corona
Maintenance
of tank and conservator: corrosion removal, welding of leaks and repainting
SAT (Site
Acceptance Test) + report
Transformatoren Maintenance Partners - Reparaties in
Werkplaats 460Maintenance & Repairs in workshop
More comprehensive repairs that cannot be executed
onsite are performed in our workshops:
Full
electrical test of transformer
Full
revision (refurbishment)
Repair of
hair cracks and corona traces on cast resin transformers
Repair of
HV/LV windings
Repair/renewal of damaged connections
Re-clamping
of the winding
Drying of
active part
Changing/repairing of tap changers and insulators
Full
blasting and painting of reservoir
FAT (Factory
Acceptance Test) + report
Engineered Services – Special Projects
Our services on transformers are not limited to
maintenance, we also execute Special Projects, such as:
Modifications and Upgrades, (eg. cooling improvement)
Relocations
Installation
and Commissioning
Transformatoren Maintenance Partners - IDAX meting
460Testing
Maintenance Partners uses modern testing equipment for
complete tests according to the highest standards:
Electrical
measurements
Insulation Resistance
Winding
Resistance
Transformer Ratios
Transformatoren Maintenance Partners - testen megger 460
Tgδ
SFRA
(Sweep Frequency Response Analysis)
Thermography
Oil analyses
Site
Acceptance Test after intervention
Factory
Acceptance Test after repair
Assessment & Maintenance Plan
Transformers are low maintenance, but
not free of maintenance. To determine the maintenance need of your
transformer(s), Maintenance Partners offers an assessment that consists of
visual inspections, oil sampling, thermography and electrical measurements.
The assessment is the foundation for a maintenance plan
in which the condition and priority of each transformer are decisive for the
maintenance frequency and needs.
Preventive Maintenance
For a safe and reliable operation of transformers,
preventive maintenance is a must. This detects problems at an early stage and
can prevent further deterioration. Preventive maintenance includes the
following tests:
- Oil
sampling + analysis (Oil quality, PCB, furan detection, moist level, …)
- Electrical
measurements (Insulation resistance, Winding resistance, Transformer Turn
Ratios, SFRA-Sweep Frequency Response Analysis, IDAX- Tgδ, …)
In addition, accessories and protections are
checked (Detection Gas Pressure Temperature,
Buchholz, Thermometer & Fans) and silica gel is replaced.
Maintenance & Repairs Onsite
Besides
preventive maintenance, we also execute repairs. The following services are offered
onsite:
- Dehumidifying,
degassing and filtering of oil using steamliner (up to 10.000 l/h)
- Refilling
or replacing oil
- Replacing
or repairing of accessories
- Renewing
of gaskets (all types)
- Cleaning
of contacts and adjusting torque
- Replacing
of bushings
- Repairing
resin / removing corona
- Maintenance
of tank and conservator: corrosion removal, welding of leaks and
repainting
- SAT
(Site Acceptance Test) + report
Maintenance & Repairs in workshop
More comprehensive repairs that cannot be executed
onsite are performed in our workshops:
- Full
electrical test of transformer
- Full
revision (refurbishment)
- Repair
of hair cracks and corona traces on cast resin transformers
- Repair
of HV/LV windings
- Repair/renewal
of damaged connections
- Re-clamping of
the winding
- Drying
of active part
- Changing/repairing
of tap changers and insulators
- Full
blasting and painting of reservoir
- FAT (Factory
Acceptance Test) + report
Engineered Services – Special Projects
Our services on transformers are not limited to
maintenance, we also execute Special Projects, such as:
- Modifications
and Upgrades, (eg. cooling improvement)
- Relocations
- Installation
and Commissioning
Testing
Maintenance Partners uses modern testing equipment for
complete tests according to the highest standards:
- Electrical
measurements
- Insulation Resistance
- Winding Resistance
- Transformer Ratios
- Tgδ
- SFRA (Sweep Frequency Response Analysis)
- Thermography
- Oil
analyses
- Site
Acceptance Test after intervention
- Factory
Acceptance Test after repair